The off season has proven to be an active time at the pool. Our maintenance contractor has been very busy readying the pool for opening day. The pump room, the heart of the pool system, has seen many improvements by changing out parts due to normal wear and tear and replacing tired hoses that had sprung leaks.
As you approach the pool, please take note of the fresh look. The cabana, decks, gutters, and sidewalk were power washed. The building shines; the decks look brighter.
You’ll notice some “ground under repair” to the right of the entrance where we have been troubleshooting the dampness that has been plaguing our building. We plan to have a simple drainage system created (trench with landscaper’s tarp, gravel or similar correction). The down spout will need to be redirected away from the building to keep the water from running back toward the foundation. The “beds” will get a new look with fresh shrubs and the bed will be sloped away from the building to ensure the water drains away from the structure.
Pool Chair

